📖 Tier 1: Prepare & Study Guide ✓ 100% Solved with Rationales

Infrastructure (Pak Studies) Solved Questions & Notes (2026) - Apex Rankers

General Competitive Exams > Pak Studies > Infrastructure

11 Total Solved Questions
~17 mins Estimated Reading Time
1 Subject Areas / Chapters
Select Topic Area / Chapter: Click any section below to switch questions

Infrastructure

100%
Showing 11 of 11 (100%)
🎯 Practice
🎉 All 11 Questions Loaded!
📜 Instructions / Reading Passage
11 Questions in this set
Choose the correct answer for the following Pakistan Studies questions:
Q. 1 Pakistan Affairs
Difficulty: Medium (1 Mark)
Pakistan's first-ever electric bus project for public transport was launched in 2025 by:
A
Lahore Metro
B
Sindh Government
✓ Correct
C
KPK Government
D
Capital Development Authority
💡 Step-by-Step Explanation & Concept Rationale
The project aimed to modernize urban transport in Karachi.
Q. 2 Pakistan Affairs
Difficulty: Medium (1 Mark)
Which province launched the largest public transport electric bus project in Sept 2025?
A
Sindh
✓ Correct
B
Punjab
C
KPK
D
Balochistan
💡 Step-by-Step Explanation & Concept Rationale
The initiative aimed to modernize urban transport in Karachi.
Q. 3 Pakistan Affairs
Difficulty: Medium (1 Mark)
The longest Railway Tunnel in Pakistan is:
A
Lowari Tunnel
B
Khojak Tunnel
✓ Correct
C
Kohat Tunnel
D
Swat Tunnel
💡 Step-by-Step Explanation & Concept Rationale
Located in Balochistan, it is a historic tunnel built in the 1890s.
Q. 4 Pakistan Affairs
Difficulty: Medium (1 Mark)
Which province launched Pakistan's largest public transport electric bus project in Sept 2025?
A
Sindh
✓ Correct
B
Punjab
C
KPK
D
Balochistan
💡 Step-by-Step Explanation & Concept Rationale
The project modernized Karachi's transport with sustainable technology.
Q. 5 Pakistan Affairs
Difficulty: Medium (1 Mark)
Which province launched the largest public transport electric bus project in Sept 2025?
A
Sindh
✓ Correct
B
Punjab
C
KPK
D
Balochistan
💡 Step-by-Step Explanation & Concept Rationale
The initiative modernized urban transport in Karachi with sustainable tech.
Q. 6 Pakistan Affairs
Difficulty: Medium (1 Mark)
The longest Railway Tunnel in Pakistan is known as:
A
Lowari Tunnel
B
Kohat Tunnel
C
Swat Tunnel
D
Khojak Tunnel
✓ Correct
💡 Step-by-Step Explanation & Concept Rationale
Located in Balochistan, it was built by the British in the late 19th century.
Q. 7 Pakistan Affairs
Difficulty: Medium (1 Mark)
Which province launched Pakistan's largest public transport electric bus project in Sept 2025?
A
Punjab
B
KPK
C
Balochistan
D
Sindh
✓ Correct
💡 Step-by-Step Explanation & Concept Rationale
The project modernized Karachi's transport with sustainable technology.
Q. 8 Pakistan Affairs
Difficulty: Medium (1 Mark)
In which province of Pakistan is the "Dasu Dam" currently under construction?
A
Sindh
B
Punjab
C
KPK
✓ Correct
D
Balochistan
💡 Step-by-Step Explanation & Concept Rationale
It is a major hydroelectric project on the Indus river.
Q. 9 Pakistan Affairs
Difficulty: Medium (1 Mark)
By which year is Pakistan Railway scheduled to complete the rail line connecting Thar Coal Mines to Port Qasim?
A
2024
B
2025
✓ Correct
C
2026
D
2027
💡 Step-by-Step Explanation & Concept Rationale
This infrastructure project is vital for transporting coal for power generation.
Q. 10 Pakistan Affairs
Difficulty: Medium (1 Mark)
What is the total installed capacity of the Bhikki Power Plant located in the Sheikhupura district?
A
1180 MW
✓ Correct
B
1320 MW
C
480 MW
D
1480 MW
💡 Step-by-Step Explanation & Concept Rationale
It is one of Pakistan's major efficient combined-cycle gas turbine plants.
Q. 11 Pakistan Affairs
Difficulty: Medium (1 Mark)
Which 75-km motorway section was inaugurated between Karachi and Hyderabad in February 2017?
A
M8
B
M9
✓ Correct
C
M12
D
M4
💡 Step-by-Step Explanation & Concept Rationale
This project modernized the primary transport link in the province.
Study Stream Progress: Showing 11 of 11 Questions (100%)
🎉 All 11 Solved Questions in Infrastructure Loaded!

You have studied the complete question pool with step-by-step rationales. Ready to test yourself?

Ready to Test Your Retention & Speed?

Now that you have reviewed the study questions and rationales, test yourself in our interactive 1-by-1 practice engine or take the full official timed mock exam.